Sovereign AI compute. Distributed by design.

1.2GW of power capacity at industrial partner sites across Europe.

300+
Sites Identified · UK & Europe · Coming soon
Explore Available Capacity
Greenweaver AI infrastructure landscape

From Blackwell to Rubin. Future-proofed.

Greenweaver builds the infrastructure layer for the AI economy, engineered for NVIDIA Blackwell and future Rubin architectures to secure the power, cooling, and connectivity that scale next-generation compute at speed.

[ AI FACTORY REFERENCE ARCHITECTURE ]
COMPUTE NVIDIA Blackwell & Rubin
RACKS 100kW+ Liquid-Cooled
COOLING Direct-to-Chip Liquid
PUE < 1.20
NETWORK Dual Dark Fibre
SECURITY ISO 27001 / SOC 2 Ready
LOCATION UK & EU Sovereign
[ STATUS: ENTERPRISE READY ]

Compute Without Waiting for the Grid.

AI demand is accelerating faster than new power infrastructure can be delivered. Greenweaver unlocks immediate deployment by placing AI Factory nodes within pre-secured industrial power environments, removing one of the largest constraints to AI growth.

Traditional Data Centres

36–48 Months

[ STATUS: UTILITY QUEUE ]

New data centre developments are increasingly delayed by grid connection bottlenecks, substation upgrades, and power allocation restrictions, creating multi-year timelines before capacity can come online.

Greenweaver

< 9 Months

[ STATUS: POWER READY ]

Greenweaver bypasses utility queues by deploying directly into sites with available power capacity. Customers gain rapid access to Blackwell and future Rubin infrastructure without waiting for traditional data centre build cycles.

Immediate Capacity. Future Scale.

Access B300/GB300 cluster capacity today and scale across Greenweaver’s expanding AI Factory network.

Node ID Location Available Capacity Go Live
GW.01 UK 1.0 MW Sept 2026
GW.02 UK 1.0 MW Sept 2026
GW.03 UK 2.0 MW Sept 2026
GW.04 UK 2.0 MW Sept 2026
GW.05 Spain 2.0 MW Sept 2026
GW.06 Sweden 2.0 MW Sept 2026
GW.07 Finland 8.0 MW Sept 2026
GW.08 UK 3.0 MW Dec 2026
GW.09 UK 4.0 MW Dec 2026
GW.10 UK 1.0 MW July 2027
GW.11 UK 2.0 MW July 2027
GW.12 Finland 2.0 MW July 2027

Two deployments. One system.

Every modular pod runs standalone. Every pod can tap a heat network. Site decides which.

Modular pod cooling section A 40-ft modular pod with closed water loop and CDU. The facility loop exits to either a heat exchanger feeding a heat network, or a dry cooler. MODULAR POD 40‑ft 100kW+ Rack 100kW+ Rack WARM RETURN CDU COOLED SUPPLY CLOSED WATER LOOP FACILITY LOOP HEAT EXCHANGER HEAT LOOP HEAT NETWORK homes · offices FACILITY LOOP DRY COOLER heat to ambient

Have Available Power Capacity?

Discuss deployment opportunities with the Greenweaver team.

Schedule a Site Assessment

Backed by Strategic Industry Partners.

SKREENHOUSE VENTURES

Industrial Infrastructure Access

HICO INVESTMENT GROUP

Institutional Capital Structuring

Reserve Capacity Now.

[ Capacity allocated on a first come, first served basis. ]

Contact Form

Request Submitted

Thank you. The Greenweaver team will follow up directly.